ICON Engineering was commissioned by ARC Energy to perform engineering
design and preparation of engineering documents such as process flow
diagrams, P & I Ds, and multidiscipline design as well as project
management, operating procedures, documentation for regulatory authorities,
assistance with construction supervision and commissioning.
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|

ICON Engineering was commissioned by ARC Energy to perform detailed
multidiscipline engineering design and construction management for the
facility. ICON prepared all design deliverables including process flow
diagrams and P&IDs.
The work included equipment procurement, construction
and commissioning management, pipeline design & installation and
operations support.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Lundin had a need to support 2 additional wells from the 6 well slot
Bunga Kekwa A platform. From conceptual design of the annexe platform
to platform installation the total project duration achieved by ICON
was only 4 1/2 months. The project was completed during the peak of
the north east monsoon season without any incidents, injuries or medical
treatments.
ICON's scope covered design assistance, installation procedure development
and all installation works.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|

ICON Engineering was commissioned by Murphy Sarawak Oil Co. to install
the West Patricia WP-PA jacket off the coast of Sarawak, Malaysia in
40 metres water depth.
ICON's involvement included responsibility for installation engineering
and site execution of the installation work.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|

Following the successful installation of the West Patricia WP-PA jacket,
ICON was engaged to install the 600 tonne topsides production module using
the floatover method. The floatover was performed after completion of
the drilling programme.
The barge anchoring, positioning, floatover and docking operation was
completed within eight hours of the barge arriving in the field.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|