Products Equipment for Jackup Drilling Rigs 
Top Tensioning System
 
Contact Us
 

Tel:  +61 8 6313 5500
Fax: +61 8 6313 5599

Level 1, 50 Kings Park Road
West Perth 6005
Western Australia

   

The ICON Top Tensioner System (TTS) is used to provide auxiliary support to the Blowout Preventer (BOP). This is often required when conductor sizes
of 13 3/8” and smaller are used.

The solution is to have a top tensioner system which is able to support the weight of the BOP. The TTS is attached to the handling padeyes on the top of the BOP and to the underside of the drill floor or to the spare lifting lugs on the BOP cranes.


Download brochure   Top Tensioning (Pull Type)

 

ICON Top Tensioning System
  Featured Products
  Equipment for
  Semi Submersible
  Drilling Rigs
  Equipment for
  Jackup Drilling Rigs
     Conductor Tensioning
     Units (CTU's)
     Conductor Tensioning
     Control Units (CTCU's)
     Top Tensioning
     Systems
     Variable Position (X-Y)
     Conductor Tension
     Deck
     Conductor Analysis
  Other Drilling
  Equipment
  Installation and
  Construction
  Equipment
  Pipeline Subsea
 
 
     
         
 
Top Tensioning BOP Crane Installation (System B)
 
         
 
© ICON Engineering Pty Ltd
Top of page    Print this page   Disclaimer   Sitemap
Home | About Us | Services | Products | Projects | Contact Us | Careers | Client Login