Laminaria Corallina Project
Heave Compensation System
Woodside Offshore Petroleum 1998
ICON Engineering was commissioned by Woodside
to supply an In Line String Motion Compensator to support a load of
227 tonnes (500,000 lbs) for the installation of the Laminaria and Corallina
subsea well completions. The work
scope included design, procurement, manufacture, testing and installation.
Incredibly the entire system was despatched 5 ½ weeks from the
initial enquiry.
Trencher Plough
Feasibility Study
Woodside Offshore Petroleum
WA NW Shelf Second Trunkline Project
The study addressed trencher and plough
options for stabilising the proposed 42” second trunkline. Trenching
machine options were considered due to the existence of cap rock,
which cannot be ploughed over a large proportion of the route. The concept
utilised two powerful cutter slicers, which precede the plough and allow
the material to be removed by the plough section.
This project was carried out in conjunction with several other specialist
sub consultants.