ICON Engineering was engaged by Chevron to provide engineering
and procurement services relating to the Coiled Tube (CT) Re-completion
operations on the Yammaderry #2 and Skate #4 wells, offshore WA.
The scope included the procurement and logistics
to supply a suitable derrick crane, engineering design / drafting and
project management.
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|

ICON Engineering was commissioned by Woodside
to supply an In Line String Motion Compensator to support a load of 227
tonnes (500,000 lbs) for the installation of the Laminaria and Corallina
subsea well completions. The work
scope included design, procurement, manufacture, testing and installation.
Incredibly the entire system was despatched 5 ½ weeks from the
initial enquiry.
| |
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 
ICON Engineering was awarded the contract to place the flowline
jumpers on the seabed in designated locations such that they could be
tied in later by ROV.
The project was unique in that the flowline placement
was undertaken from a semisub drilling rig. Traditionally, this work
has been carried out from a DP Diving Support Vessel. The method was
cost effective since the rig was on site to drill the wells.
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 
ICON Engineering upgraded Diamond’s Ocean Bounty MODU to
improve the rig's tree handling capabilities. The scope included a major
re-configuration of the cellar deck area, repositioning of two deck
cranes, installation of a new deck crane and provision of a subsea tree
skidding system.
The entire work scope was undertaken while the
rig was under tow from Bass Strait to a location on the NW Shelf WA.
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 
ICON was commissioned to project manage and execute several projects
on the Sedco 702 rig. These included ; repair of vessel impact damage
to a stability column and replacement of a chain locker lining.
In each case, the work involved preparation of the repair procedures,
procurement of materials, prefabrication, execution of the repair work
offshore and preparation of ‘as built’ documentation for
submission to the classifying authority American Bureau of Shipping.

|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|